請更新您的瀏覽器

您使用的瀏覽器版本較舊,已不再受支援。建議您更新瀏覽器版本,以獲得最佳使用體驗。

Renovation of Beijing Workers Stadium for 2023 AFC Asian Cup progresses above-ground

XINHUA

發布於 2021年08月28日14:16

The renovation project of Beijing Workers Stadium, which will host the opening and closing ceremonies as well as the finals of 2023 AFC Asian Cup, has entered the construction stage of above-ground engineering. (photo courtesy of Beijing Zhonghe Industrial Sports Culture Development Co., Ltd.)

The renovation project of Beijing Workers Stadium has entered the construction stage of above-ground engineering.

BEIJING, Aug. 28 (Xinhua) -- The renovation project of Beijing Workers Stadium, which will host the opening and closing ceremonies as well as the finals of 2023 AFC Asian Cup, has entered the construction stage of above-ground engineering.

Under the project, which was launched last August, the stadium will be transformed into a professional football field, not only to meet the needs of the 2023 AFC Asian Cup, but also to be eligible for higher-level international football matches in the future.

The new canopy will enable the stadium to run games under extreme weather conditions and the position of the closest stands will be only 8.5 meters away from the lawn after the removal of the runway to enhance the audiences enjoy the games.

In addition, the number of seats for the audience will be increased to nearly 68,000.

According to the plan, the above-ground concrete structure of the stadium will be completed by mid-November this year, and the steel structure will be finished early next year, with the project finally to be completed in December 2022.  ■

Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...

留言 3

留言功能已停止提供服務。試試全新的「引用」功能來留下你的想法。

Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...
Loading...