GLOBALink | Beijing-Guangzhou high-speed railway starts operation at 350 km/h
XINHUA
發布於 06月15日12:09 • Wang Zichen,Pan Zhiwei,Tian Zhongquan,Wu Zhizun
WUHAN, June 15 (Xinhua) -- The Fuxing bullet trains on the Wuhan-Guangzhou section of the Beijing-Guangzhou high-speed railway started operating at a speed of 350 km/h on Saturday. As the backbone of the high-speed rail network in China, the 2,298-km Beijing-Guangzhou high-speed railway started normal operation at a speed of 350 km/h for Fuxing bullet trains on the whole line.